Connecting the panels before the battery.
Battery first, always. The controller reads system voltage from it.
Installing
Wire the panels to an MPPT controller with a true lithium profile, land the controller's output on the bank through its own fuse, and connect the battery side before the panel side when commissioning.
No float stage and no equalisation. Verify in the manual. A controller that floats a lithium bank holds it at high state of charge, which is where it ages fastest, and an equalisation cycle can exceed the pack's voltage limit.
Calculate from your panels in series using open-circuit voltage on a cold morning, not rated operating voltage. Exceeding this limit destroys the controller instantly and is not covered by warranty.
MPPT controllers detect system voltage from the battery. Connecting panels first can leave the controller unable to identify the bank, and some are damaged by it. Battery, then panels — reverse the order to decommission.
The output cable runs to a source that can deliver thousands of amps into a fault. It needs its own protection near the bank, sized to the cable.
If the controller's negative goes to the battery side of the shunt, every amp of solar is invisible to the monitor and the state of charge will read permanently low.
Absorption voltage, absorption time and the cut-off from the pack's own specification. Generic lithium presets are a starting point, not the answer.
Compare the controller's reported current against the array rating divided by bank voltage. Substantially less usually means shading, a series string pulled down by one panel, or a wiring fault.
Connecting the panels before the battery.
Battery first, always. The controller reads system voltage from it.
Landing the controller negative directly on the battery.
It goes on the load side of the shunt, or the monitor never sees the solar.
More on installing
Take the load estimate, charging sources and cable runs to a qualified marine electrician. Our installation guide helps you ask about isolation, over-current protection, ventilation and compliance before work begins.