Specifications and model checks

This profile identifies a brand and rating or model family. Confirm the precise variant and current datasheet; voltage, monitoring and environmental limits can vary between versions.

Rating400 A
TypeClass-T
Interrupt rating20,000 A at 125 V DC
FitsBank terminal or holder

Suitable boat applications

400 Ah and larger banks with a substantial inverter.

Compatibility limits to check

Your cable cannot carry 400 A — the fuse must protect the cable, not the battery.

For how to size this against your own boat rather than against a spec sheet, read fuses and circuit protection.

Sized for your boat

400 A

Fuse rating for a 400 Ah bank

A starting point, not a specification. The correct fuse rating comes from the cable you actually run and its length, not from the bank alone. Have a suitably qualified person check the design against AS/NZS 3004.2 and the licensing rules that apply to your vessel and jurisdiction.

Closest rating we list

Before choosing Blue Sea Systems Class-T 400 A

Fuse interrupt ratings and cable protection

A fuse or switch is selected for its role in the actual circuit. Physical fit and the printed current rating do not establish suitability for the available fault current, voltage or connected cable. Ask for the protection schedule in the final system documents and obtain the exact approved spare part numbers before remote travel.

Confirm specifications against the exact model and revision offered by the supplier. A listed price band is a planning reference; request a current written quote with installation and commissioning separated from equipment supply.


Compared with


The rest of the category

ProductFuse ratingPrice band
Blue Sea Systems Class-T 200 A200 A$90–$150
Blue Sea Systems MRBF terminal 300 A300 A$45–$80

Turn the estimate intoan installation plan.

Take the load estimate, charging sources and cable runs to a qualified marine electrician. Our installation guide helps you ask about isolation, over-current protection, ventilation and compliance before work begins.