Planning

How to Budget a Marine Lithium Battery Conversion

Budget the bank, then add the charging and protection hardware, which on most boats runs between a third and a half of the battery cost again, then add labour. Compare quotes on dollars per usable kilowatt-hour, not on label capacity.

Steps
6
Last reviewed
4 September 2026
Independence
Nobody paid for this page.

Equipment and information required

  • Your measured daily amp-hour draw
  • The nights you spend away from shore power

How to Budget a Marine Lithium Battery Conversion: steps

  1. Start from usable capacity

    Size the bank from your daily draw and your nights at anchor, remembering that you cycle lithium to 80%. That gives the amp-hours you are actually buying.

  2. Price the cases on dollars per usable kilowatt-hour

    This is the only figure that compares a 12 V case against a 24 V one honestly. Dollars per amp-hour misrepresents every 24 V battery on the market, because an amp-hour at 25.6 V is twice the energy of one at 12.8 V.

  3. Add the charging path

    A DC-DC charger sized to your alternator, an MPPT controller with a true lithium profile if you have solar, and a mains charger that will not float a lithium bank indefinitely.

  4. Add protection and monitoring

    A Class-T fuse at each pack's positive terminal, cable sized for the currents the new system can pass, and a shunt-based monitor. These are not accessories on a lithium bank.

  5. Add labour, and ask what it covers

    A quote that includes commissioning — charge voltages set, monitor calibrated, a documented wiring diagram — is worth more than one that ends when the cable is landed.

  6. Hold back a contingency for the boat you actually have

    Old cable runs, a battery box that will not take the new footprint, and a mains charger with no lithium profile are the three surprises that turn up most often once the panels come off.

Common installation and calculation errors

Comparing quotes on total amp-hours.

Compare on dollars per usable kilowatt-hour, which is chemistry- and voltage-neutral.

Related equipment and battery guides


More on planning

Turn the estimate intoan installation plan.

Take the load estimate, charging sources and cable runs to a qualified marine electrician. Our installation guide helps you ask about isolation, over-current protection, ventilation and compliance before work begins.