Typical load profile

220 Ah a day

Fridge and freezer, year-round95 Ah
Inverter — laptops, appliances, tools40 Ah
Lighting and fans30 Ah
Instruments, AIS, comms, Starlink35 Ah
Pumps and devices20 Ah

Communications are the new load on a liveaboard: a satellite terminal alone is 3 to 4 A around the clock. Budget for it explicitly rather than in the reserve.

What we would fit · 600–800 Ah

Budget build

$11,500

800 Ah LiFePO4, 12 V, two parallel packs

50 A DC-DC charger

Lithium-profile 60 A mains charger

800 W solar with MPPT

Shunt monitor with history

Premium build

$21,000

1000 Ah at 24 V equivalent, three packs

Externally regulated 120 A alternator with temperature sensing

3 kW inverter-charger, galvanic isolation

1.2 kW solar plus wind if the boat cruises south

Certified install, documented for insurer and survey

Indicative installed prices, September 2026. On a liveaboard, spend the premium on monitoring and redundancy before more amp-hours.


On this hull specifically

Battery installation mistakes for this boat type

01

Buying capacity instead of charging

A liveaboard with 1000 Ah and a 60 A alternator still runs the engine for hours. Solar and a proper alternator regulator return more days of quiet than another 200 Ah.

02

No cold-weather plan

Liveaboards move. A bank specified in Cairns will meet a Hobart winter eventually. Low-temperature charge protection is not optional on a boat that travels.

03

Skipping the paperwork

Insurers ask liveaboards harder questions than weekenders. Certification, a BMS datasheet and a wiring diagram in a folder is the difference between a claim paid and a claim argued.

04

Letting the bank do the starting

Even with a big bank and a big BMS, keep the engine on its own lead-acid battery. It is the one system you do not want sharing a disconnect.


Other hulls

Turn the estimate intoan installation plan.

Take the load estimate, charging sources and cable runs to a qualified marine electrician. Our installation guide helps you ask about isolation, over-current protection, ventilation and compliance before work begins.