Selection criteria and compatibility

  1. A shunt, on the negative, between the bank and everything else.
  2. A rating above your largest possible current, which is usually the inverter.
  3. A display you will actually look at — phone or panel, but pick honestly.
  4. Calibration at install and again after the first full charge, or the reading drifts.

The mistake to avoid

Putting the shunt in the wrong place

If any load or charge source connects to the battery on the shunt's battery side, that current is invisible and every reading afterwards is wrong. The shunt goes on the negative, between the bank and absolutely everything else.


The picks

Recommended options by application

Most boats

Victron SmartShunt 500 A

$180–$260

A shunt and Bluetooth with no hole to cut in a bulkhead. The one we would fit on almost any boat.

Where it falls short: You want a physical display you can glance at from the helm.

Full detail

A number visible from the helm

Victron BMV 712 500 A

$250–$340

The same shunt with a panel display, for people who want the figure without reaching for a phone.

Where it falls short: You would rather not cut a hole in the bulkhead.

Full detail

Certified marine install

Enerdrive eLite 500 A

$280–$390

Marine-documented monitoring that matches the rest of an Enerdrive system.

Where it falls short: You want the cheapest route to a shunt reading.

Full detail

Tightest budget

Renogy shunt 500 A

$110–$180

It counts amps correctly, which is most of the job. Fit this rather than fit nothing.

Where it falls short: You need logging you can export, or marine documentation.

Full detail

Before you buy

Confirm battery capacity and equipment compatibility

A recommendation is only worth acting on once you know what the boat needs. The calculator works it out from your own loads in about a minute, and everything above reads differently afterwards.

Turn the estimate intoan installation plan.

Take the load estimate, charging sources and cable runs to a qualified marine electrician. Our installation guide helps you ask about isolation, over-current protection, ventilation and compliance before work begins.